A14 Planned road closures w/c 21 September

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.
For this week, the planned closures are:

Full closures
Monday 21 to Saturday 26 (six nights)
• Hinchingbrooke Park Road loop
• Swavesey junction overbridge southbound, between A14 eastbound junction 24 entry slip and A14 westbound junction 24b exit slip

Vehicles on the A14 wishing to access Boxworth and the Services will be diverted to continue on the A14 to Bar Hill junction 25 and return westbound to exit at junction 24a. Vehicles from the A1307 or Swavesey wishing to access the A14 westbound can travel east on the A1307 or A14 to Bar Hill and return westbound

Wednesday 23 to Saturday 26 (four nights)
• A14 westbound Swavesey junction 24b exit slip

Vehicles will be signposted to exit the A14 at junction 24a for Boxworth and the Services

Saturday 26 (one night) 9pm – 8am
• Brampton Road B1514 between station car park and Edison Bell Way

Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/ , or stay updated by following us on https://twitter.com/a14c2h