A14 C2H – Planned road closures w/c 26 October

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements
We are currently carrying out finishing works for which we need to close lanes  or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures
Monday 26 9.30am to 3.30pm
• A1307 between Buckingway roundabout, Swavesey and Bar Hill/B1050 junction
Traffic will be diverted to use the A14 between Swavesey junction 24 and Bar Hill junction 25. Access to Lolworth and businesses within the closure will be via escort from Buckingway roundabout

Monday 26 (one night)
Contingency closure Tuesday 27 (one night)
• A14 westbound Six Mile Bottom junction 36 to Girton junction 31
Vehicles will be diverted via A11 southbound, A505 westbound and M11 northbound to re-join the A14

Tuesday 27 (one night)
Contingency closure Wednesday 28 (one night)
• A428 eastbound Madingley to A14 eastbound Milton junction 33
Vehicles will be diverted via A1303 eastbound, M11 southbound, A505 eastbound and A11 northbound to re-join the A14 at junction 36. Non-motorway traffic will be diverted through Cambridge

Wednesday 28 (one night)
• A1307 eastbound between Fenstanton and Buckingway roundabout, Swavesey
Vehicles will be diverted west on A1307 to Godmanchester, A1198 southbound and then east on the A428 at Caxton Gibbet

Wednesday 28 (one night)
Contingency closure Thursday 29 (one night)
• M11 northbound junction 13 to A14 westbound Swavesey junction 24b
Vehicles will be diverted via A1303 westbound to the A428 and northbound on A1198 at Caxton Gibbet to re-join the A14 westbound at Godmanchester junction 23

Thursday 29 to Friday 30 (two nights)
• A14 eastbound Godmanchester/A1198 junction 23 to Girton junction 31
Vehicles will be diverted south on the A1198 and eats on the A428 at Caxton Gibbet to re-join the A14 or to join the M11

Saturday 31 October and Sunday 1 November (two nights)
• A14 eastbound New Ellington junction 21 to Swavesey junction 24
Vehicles will be diverted to exit the A14 at New Ellington onto the A141 to Brampton Hut roundabout, south on the A1 to Wyboston and then onto the A428 eastbound to re-join the A14 at Girton junction 31
• A1 southbound to A14 eastbound Brampton Interchange junction 22
Vehicles will be dverted to continue south on the A1 to Wyboston and then onto the A428 eastbound to join the A14 at Girton junction 31

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/