A14 C2H – Planned road closures w/c 22 March 2021

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 9pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Saturday 27 8am to 5pm
• B1514 Brampton Road between station car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

Saturday 27 to Sunday 28 (two nights)
• M11 northbound junction 14 exit slip (M11 northbound to A14 eastbound)
Vehicles will be diverted to continue on the A14 westbound to Bar Hill junction 25 and return on the eastbound carriageway
• A428 eastbound between Madingley and Girton
Vehicles will be diverted via the A1303. Non-motorway traffic will then be diverted on roads through Cambridge and motorway traffic will be diverted south on M11, east on A505 and north on the A11 to re-joint the A14 at junction 36
• A428 westbound between Girton and Madingley (including A14 westbound exit slip to M11 southbound)
Vehicles will be diverted onto A14 westbound, exit at junction 24b for the A1307, then south on the A1198 at Godmanchester to re-join the A428 at Caxton Gibbet
M11 bound traffic will be diverted to continue on A14 westbound to Bar Hill junction 25, exit and return on the A14 eastbound to access the M11

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/